The Construction tin plant on conversion vegetables and fruit in village Pervomayskiy Leningradskiy district

Project name The Construction tin plant on conversion vegetables and fruit in village Pervomayskiy Leningradskiy district
Location of the project Leningradskiy district
Industry classification Agriculture
Basic information about the project
Project essence The Construction tin plant on conversion vegetables and fruit in village Pervomayskiy Leningradskiy district
Project capacity The Annual volume of production product: - Vegetable air-tight in assortment - 7500 thous. bank; - a canned fruits in assortment - 3 775 thous. bank; - juice in assortment - 224 thous. bank. General volume sales of products per annum - 389 283 thous. rub
Financial estimation of the project
Total cost of the project, mln rubles 100,0 mln. rub.:
Investment capacity, mln rubles 100,0 mln. rub.:
Conditions of investor participation Direct investments - 100% facility of the investor
Payback period 5.5 years
Land characteristics
Location Krasnodar region, Leningradskiy district, Pervomayskiy village, str. Pervomayskaya
Land plot area (m2) 20000,0 m2
Ground categories Lands of the populated points
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL-10KV 8 ì
Gas supply Gasmain of the average pressure O -219 mm 38 ì
Water supply Asbest pipe O-150mm 67 ì
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Leningradskaya village 17,0
Center of federal subject Krasnodar city 190,0
Highway (regional, federal significance) marginal importance 10,0
Roads of local significance Adjoin to area
Nearest railway station Starominskaya village 35,0
Nearest railway lines Starominskaya village 35,0
Airport ROSTOV-on-Donu sity 140,0
Seaport Eysk city 120,0