Project name |
The Construction tin plant on conversion vegetables and fruit in village Pervomayskiy Leningradskiy district |
Location of the project |
Leningradskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The Construction tin plant on conversion vegetables and fruit in village Pervomayskiy Leningradskiy district |
Project capacity |
The Annual volume of production product: - Vegetable air-tight in assortment - 7500 thous. bank; - a canned fruits in assortment - 3 775 thous. bank; - juice in assortment - 224 thous. bank. General volume sales of products per annum - 389 283 thous. rub |
Financial estimation of the project |
Total cost of the project, mln rubles |
100,0 mln. rub.: |
Investment capacity, mln rubles |
100,0 mln. rub.: |
Conditions of investor participation |
Direct investments - 100% facility of the investor |
Payback period |
5.5 years |
Land characteristics |
Location |
Krasnodar region, Leningradskiy district, Pervomayskiy village, str. Pervomayskaya |
Land plot area (m2) |
20000,0 m2 |
Ground categories |
Lands of the populated points |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10KV |
8 ì |
Gas supply |
Gasmain of the average pressure O -219 mm |
38 ì |
Water supply |
Asbest pipe O-150mm |
67 ì |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Leningradskaya village |
17,0 |
Center of federal subject |
Krasnodar city |
190,0 |
Highway (regional, federal significance) |
marginal importance |
10,0 |
Roads of local significance |
|
Adjoin to area |
Nearest railway station |
Starominskaya village |
35,0 |
Nearest railway lines |
Starominskaya village |
35,0 |
Airport |
ROSTOV-on-Donu sity |
140,0 |
Seaport |
Eysk city |
120,0 |