Project name |
A wholesale and retail complex on the harvesting and sale of agricultural products. |
Location of the project |
Kanevskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction Wholesale and retail complex on the harvesting and sale of agricultural products in the area Kanevsky. |
Project purpose |
– to meet the demand for work on the harvesting of crop agriculture and its implementation in the area Kanevsky, as well as neighboring areas (Bruhovetskaya district, Leningrad region); – to organize 57 jobs; provide tax payments to the budgets o |
Project capacity |
Potatoes – 856 tons / year, ñabbage – 514 tons / year, bow – 514 tons / year carrot – 514 tons / year, green – 21 tons / year. |
Consumer market description |
Potential consumers of crop products wholesale-retail complex will include: population; – trading networks |
Object construction term |
A year and 3 months |
Competitive advantage |
- Expansion of production capacity at a rate more than is required at the moment the market. In the case of increasing demand the company will be able to gain greater market share and ensure the implementation of additional orders; - Liaise with th |
Resource availability for project realization |
The presence of land of 1,2 hectares |
Planned volume of resource consumption (annual) |
Planned volume of electricity consumption (annual), MW |
45,6 |
Planned volume of gas consumption (annual), million cubic meters |
0,009 |
Planned volume of water consumption (annual), million cubic meters |
0,0003 |
Degree of project development |
The business plan is developed, are got of the preliminary technical requirements. |
Financial estimation of the project |
Total cost of the project, mln rubles |
60,0 |
Own resources, million rubles |
- |
Means of regional (municipal) budget, million rubles |
- |
Previously involved means, million rubles |
- |
Investment capacity, mln rubles |
60,0 |
Conditions of investor participation |
Direct investments |
Form of investments return |
Monetary |
Payback period |
3,75 years |
Basic indicators of investment project economic efficiency |
Net present value (NPV) |
37,9 mln.rbl. |
Simple payback time |
3,75 years |
Discounted payback period |
4,5 years |
Internal rate of return (IRR) |
31,01% |
Productivity index (PI) |
1,76 |
Income |
55,9 mln.rbl. |
Social efficiency of investment project |
Number of workplaces |
57 |
Salary average level |
12 947,00 rbl. |
Budgetary efficiency of investment project |
Mid-annual tax payments, million rubles |
5,407 mln.rbl. |
which includes into consolidated budget of the krai, million rubles |
2,647 mln.rbl. |
Land characteristics |
Location |
Krasnodar Region, Kanevskaya district, item Novominskaya, street Kulturnaya. |
Cadastral number of quarter |
23:11:0202078 |
Land plot area (m2) |
12000 |
Ground categories |
The earths of settlements |
Kind of permitted use |
For building a wholesale and retail complex on the harvesting and sale of agricultural products. |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No, the site is free from building |
Authorizations, urban planning documentation |
Council Decision Novominskogo rural settlement "On approval of land use and area development Novominskogo rural settlement of Kanev region" from 18.02.2010, ¹ 31. |
Information on proprietor (franchisor) of ground area |
Proprietor |
State ownershih |
Franchisor |
Kanevsky area |
Right kind |
Not registered |
Data on encumbrances |
Kind of encumbrances, restrictions |
Not established |
Area of encumbrances |
- |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
P / S 35/10 kV Kirov VL-10 KV-5 |
150 |
Gas supply |
High pressure gas pipeline on the street. Nekrasov, up to 200 m3 / hour |
650 |
Water supply |
Sewage on the street Kulturnaya |
100 |
Sewerage system |
Small treatment plants |
On the territory of the site |
Telephone penetration |
ATS, street Sovetskaya, cable TPPepZ |
1700 |
Cost of maintenance of ground area with engineering infrastructure (million rubles) |
0,95 |
Additional information on ground area |
Special conditions |
Climate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation – 500 mm, capacity of a snow cover – 14 see According to cards of division into districts of climatic characteristic |
Cost of rent/repayment of ground area (million rubles) |
0,07 |
Notes |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The item Kanevsky |
26 |
Center of federal subject |
The city of Krasnodar |
143 |
Highway (regional, federal significance) |
«Krasnodar-Yeysk» |
1 |
Roads of local significance |
Kanevskaya-Pridorochznaya |
1 |
Nearest railway station |
The item Kanevsky |
6 |
Nearest railway lines |
The item Kanevsky |
6 |
Airport |
The city of Krasnodar |
160 |
Seaport |
The city of Yeysk |
94 |
Contact information |
Information on project proponent |
Administration of municipal union Kanevsky area. The post address: the item Kanevsky, street Gorkogo, 60. Site: www. Kaninvest. ru Phone/fax: 8(86164) 7-03-07. The electronic address: post@kanevskadm.ru. |
Information on applicant |
Administration of municipal union Kanevsky area The post address: the item Kanevsky street Gorkogo, 60 Site: www.Kaninvest.ru Phone/fax: 8(86164) 7-03-07. The electronic address: post@kanevskadm.ru. The executive: the assistant to the head of |