A wholesale and retail complex on the harvesting and sale of agricultural products.

Project name A wholesale and retail complex on the harvesting and sale of agricultural products.
Location of the project Kanevskiy district
Industry classification Agriculture
Basic information about the project
Project essence Construction Wholesale and retail complex on the harvesting and sale of agricultural products in the area Kanevsky.
Project purpose – to meet the demand for work on the harvesting of crop agriculture and its implementation in the area Kanevsky, as well as neighboring areas (Bruhovetskaya district, Leningrad region); – to organize 57 jobs; provide tax payments to the budgets o
Project capacity Potatoes – 856 tons / year, ñabbage – 514 tons / year, bow – 514 tons / year carrot – 514 tons / year, green – 21 tons / year.
Consumer market description Potential consumers of crop products wholesale-retail complex will include: population; – trading networks
Object construction term A year and 3 months
Competitive advantage - Expansion of production capacity at a rate more than is required at the moment the market. In the case of increasing demand the company will be able to gain greater market share and ensure the implementation of additional orders; - Liaise with th
Resource availability for project realization The presence of land of 1,2 hectares
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MW 45,6
Planned volume of gas consumption (annual), million cubic meters 0,009
Planned volume of water consumption (annual), million cubic meters 0,0003
Degree of project development The business plan is developed, are got of the preliminary technical requirements.
Financial estimation of the project
Total cost of the project, mln rubles 60,0
Own resources, million rubles -
Means of regional (municipal) budget, million rubles -
Previously involved means, million rubles -
Investment capacity, mln rubles 60,0
Conditions of investor participation Direct investments
Form of investments return Monetary
Payback period 3,75 years
Basic indicators of investment project economic efficiency
Net present value (NPV) 37,9 mln.rbl.
Simple payback time 3,75 years
Discounted payback period 4,5 years
Internal rate of return (IRR) 31,01%
Productivity index (PI) 1,76
Income 55,9 mln.rbl.
Social efficiency of investment project
Number of workplaces 57
Salary average level 12 947,00 rbl.
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles 5,407 mln.rbl.
which includes into consolidated budget of the krai, million rubles 2,647 mln.rbl.
Land characteristics
Location Krasnodar Region, Kanevskaya district, item Novominskaya, street Kulturnaya.
Cadastral number of quarter 23:11:0202078
Land plot area (m2) 12000
Ground categories The earths of settlements
Kind of permitted use For building a wholesale and retail complex on the harvesting and sale of agricultural products.
Actual use It is not used
Availability of buildings, structures, constructions No, the site is free from building
Authorizations, urban planning documentation Council Decision Novominskogo rural settlement "On approval of land use and area development Novominskogo rural settlement of Kanev region" from 18.02.2010, ¹ 31.
Information on proprietor (franchisor) of ground area
Proprietor State ownershih
Franchisor Kanevsky area
Right kind Not registered
Data on encumbrances
Kind of encumbrances, restrictions Not established
Area of encumbrances -
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply P / S 35/10 kV Kirov VL-10 KV-5 150
Gas supply High pressure gas pipeline on the street. Nekrasov, up to 200 m3 / hour 650
Water supply Sewage on the street Kulturnaya 100
Sewerage system Small treatment plants On the territory of the site
Telephone penetration ATS, street Sovetskaya, cable TPPepZ 1700
Cost of maintenance of ground area with engineering infrastructure (million rubles) 0,95
Additional information on ground area
Special conditions Climate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation – 500 mm, capacity of a snow cover – 14 see According to cards of division into districts of climatic characteristic
Cost of rent/repayment of ground area (million rubles) 0,07
Notes -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center The item Kanevsky 26
Center of federal subject The city of Krasnodar 143
Highway (regional, federal significance) «Krasnodar-Yeysk» 1
Roads of local significance Kanevskaya-Pridorochznaya 1
Nearest railway station The item Kanevsky 6
Nearest railway lines The item Kanevsky 6
Airport The city of Krasnodar 160
Seaport The city of Yeysk 94
Contact information
Information on project proponent Administration of municipal union Kanevsky area. The post address: the item Kanevsky, street Gorkogo, 60. Site: www. Kaninvest. ru Phone/fax: 8(86164) 7-03-07. The electronic address: post@kanevskadm.ru.
Information on applicant Administration of municipal union Kanevsky area The post address: the item Kanevsky street Gorkogo, 60 Site: www.Kaninvest.ru Phone/fax: 8(86164) 7-03-07. The electronic address: post@kanevskadm.ru. The executive: the assistant to the head of