Construction of factory on agricultural products processing

Project name Construction of factory on agricultural products processing
Location of the project Tbilisskiy district
Industry classification Agriculture
Basic information about the project
Project essence Construction of factory on agricultural products processing. Release of canned meat and vegetables.
Project capacity 5 000 tons of canned products a year
Financial estimation of the project
Total cost of the project, mln rubles 399 mln.rbl.
Investment capacity, mln rubles 399 mln.rbl.
Conditions of investor participation Direct investments
Payback period 5,8 years
Land characteristics
Location Tbilisskaya village, joins north border of the plot of mixed feed plant
Land plot area (m2) 15000 sq.m.
Ground categories settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 110/35/10 kw 1000
Gas supply from existing gas pipe with high pressure 50
Water supply from existing water pipe d-200mm., free pressure in net 1,5 atm. 1800
Sewerage system local
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village
Center of federal subject Krasnodar city 99
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 0,25
Roads of local significance existing motoroad with gravel surfacing comes to the plot 0,8
Nearest railway station Grechishkino station 3,1
Nearest railway lines Krasnodar-Kropotkin 0,9
Airport Krasnodar airport 93
Seaport Novorossiysk seaport 280