Project name |
Construction sausage mini - a shop |
Location of the project |
Kavkazskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
the project is provided construction sausage mini shop on production of the ready meat products (the sausage). |
Project capacity |
1 tons sausage product per annum |
Financial estimation of the project |
Total cost of the project, mln rubles |
25,305 |
Investment capacity, mln rubles |
25,305 |
Conditions of investor participation |
Direct investments |
Payback period |
3,7 |
Land characteristics |
Location |
The Caucasian region, cl. Caucasian, str. Krasniy Pahar (Red Plowman), 51а |
Land plot area (m2) |
1365 |
Ground categories |
Lands of the populated points |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
installation new KTP is required |
690 |
Gas supply |
|
130 |
Water supply |
the existinging pluming on str. Red Plowman, d-32 mm |
170 |
Sewerage system |
construction individual |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Kropotkin |
6,0 |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
FAD "Caucasus" автодорога marginal importance Stavropoli - Temryuk - Krasnodar. |
7,0 2,4 |
Roads of local significance |
str Red Plowman - a road with asphalt covering |
0,05 |
Nearest railway station |
station "Getmanovskaya |
1,85 |
Nearest railway lines |
OAO "RZHD" |
1,2 |
Airport |
city Krasnodar |
140 |
Seaport |
city Novorossiysk |
285 |