Project name |
Factory on production and bottling of potable water and drinks |
Location of the project |
Tbilisskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of the Factory on production and bottling of potable water and drinks |
Project capacity |
10 560 000 bottles |
Financial estimation of the project |
Total cost of the project, mln rubles |
99 490 mln.rbl. |
Investment capacity, mln rubles |
99 490 mln.rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
2 year |
Land characteristics |
Location |
300 meters to the west from Tbilisskaya village |
Land plot area (m2) |
10000 sq.m. |
Ground categories |
settlements land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from existing power station 110/35/10 kw |
1000 |
Gas supply |
from existing gas pipe with low pressure |
190 |
Water supply |
from existing water pipe d-200mm., free pressure in net 1,5 atm. |
1600 |
Sewerage system |
local |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Tbilisskaya village |
|
Center of federal subject |
Krasnodar city |
97 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
1 |
Roads of local significance |
existing natural soil road |
0,17 |
Nearest railway station |
Grechishkino station |
2,4 |
Nearest railway lines |
Krasnodar-Kropotkin |
0,13 |
Airport |
Krasnodar airport |
90 |
Seaport |
Novorossiysk seaport |
280 |