Factory on production and bottling of potable water and drinks

Project name Factory on production and bottling of potable water and drinks
Location of the project Tbilisskiy district
Industry classification Agriculture
Basic information about the project
Project essence Construction of the Factory on production and bottling of potable water and drinks
Project capacity 10 560 000 bottles
Financial estimation of the project
Total cost of the project, mln rubles 99 490 mln.rbl.
Investment capacity, mln rubles 99 490 mln.rbl.
Conditions of investor participation Direct investments
Payback period 2 year
Land characteristics
Location 300 meters to the west from Tbilisskaya village
Land plot area (m2) 10000 sq.m.
Ground categories settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 110/35/10 kw 1000
Gas supply from existing gas pipe with low pressure 190
Water supply from existing water pipe d-200mm., free pressure in net 1,5 atm. 1600
Sewerage system local
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village
Center of federal subject Krasnodar city 97
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 1
Roads of local significance existing natural soil road 0,17
Nearest railway station Grechishkino station 2,4
Nearest railway lines Krasnodar-Kropotkin 0,13
Airport Krasnodar airport 90
Seaport Novorossiysk seaport 280