Project name |
Construction of Greenhouse Complex |
Location of the project |
Kavkazskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Greenhouse construction – cut flower (roses) production |
Project capacity |
Growing and cutting of 2800 thousand flowers per year |
Financial estimation of the project |
Total cost of the project, mln rubles |
29,409 millions of the roubles |
Investment capacity, mln rubles |
29,409 millions of the roubles |
Conditions of investor participation |
Direct investments |
Payback period |
2,0 years |
Land characteristics |
Location |
2v Severnaya Street, M. Gorkogo Village, Krasnodar region |
Land plot area (m2) |
140000 square metre |
Ground categories |
Agricultural lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
“Gorkovskaya” substation 35/10 kV |
1900 |
Gas supply |
High pressure underground gas pipeline on Shkolnaya street |
650 |
Water supply |
Water intake facility Construction of artesian borehole is required |
400 |
Sewerage system |
Construction of local sewage treatment plant |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kropotkin |
18,3 |
Center of federal subject |
Krasnodar |
160 |
Highway (regional, federal significance) |
Federal highway “Kavkaz” Motor road of regional significance “Stavropol – Temryuk – Krasnodar” |
20 10,3 |
Roads of local significance |
Motor road st. Kavkazskaya – st. Novopokrovskaya |
3,8 |
Nearest railway station |
“Getmanovskaya” station |
11,6 |
Nearest railway lines |
“Getmanovskaya” station |
11,6 |
Airport |
Krasnodar |
160 |
Seaport |
Novorossiysk |
285 |