Building of pectinaceous factory

Project name Building of pectinaceous factory
Location of the project Korenovskiy district
Industry classification Agriculture
Basic information about the project
Project essence Building of pectinaceous factory in territory of Korenovsky area
Project capacity To 3 tons of a pectinaceous powder a year
Financial estimation of the project
Total cost of the project, mln rubles 108,5 million rbl.
Investment capacity, mln rubles 108,5 million rbl.
Conditions of investor participation Direct investments
Payback period 3,9 years.
Land characteristics
Location Krasnodar territory, Korenovsky area, southern suburb of a village Platnirovsky
Land plot area (m2) 100000 sq. m
Ground categories The earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply -35/10 "Native land" -10 from "Native land" 1000
Gas supply Connection point - from an existing steel underground gas pipeline of a gas pipeline of a high pressure on Southern 2000
Water supply The connection point to provide water intake building in territory of factory with the subsequent connection to waterpipe "the Versatile person", being in 0,3 km severo-to the east factory, volume of water consumption of 20 cubic m. / days 300
Sewerage system Building of small treatment facilities on enterprise territories, volume of water removal of 20,0 cubic m/days
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center The city of Korenovsk 10
Center of federal subject Krasnodar city 50
Highway (regional, federal significance) 4 DON 5
Roads of local significance Street Kucherjavogo 0,02
Nearest railway station Item station Platnirovsky 4
Nearest railway lines 2
Airport The airport Krasnodar 60
Seaport Novorossisk 250