Project name |
Building of pectinaceous factory |
Location of the project |
Korenovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Building of pectinaceous factory in territory of Korenovsky area |
Project capacity |
To 3 tons of a pectinaceous powder a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
108,5 million rbl. |
Investment capacity, mln rubles |
108,5 million rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
3,9 years. |
Land characteristics |
Location |
Krasnodar territory, Korenovsky area, southern suburb of a village Platnirovsky |
Land plot area (m2) |
100000 sq. m |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
ÏÑ-35/10 ê "Native land" ÐÓ-10 ê from ÏÑ "Native land" |
1000 |
Gas supply |
Connection point - from an existing steel underground gas pipeline of a gas pipeline of a high pressure on óë Southern |
2000 |
Water supply |
The connection point — to provide water intake building in territory of factory with the subsequent connection to waterpipe ÌÓÏ "the Versatile person", being in 0,3 km severo-to the east factory, volume of water consumption of 20 cubic m. / days |
300 |
Sewerage system |
Building of small treatment facilities on enterprise territories, volume of water removal of 20,0 cubic m/days |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Korenovsk |
10 |
Center of federal subject |
Krasnodar city |
50 |
Highway (regional, federal significance) |
Ì4 DON |
5 |
Roads of local significance |
Street Kucherjavogo |
0,02 |
Nearest railway station |
Item station Platnirovsky |
4 |
Nearest railway lines |
|
2 |
Airport |
The airport Krasnodar |
60 |
Seaport |
Novorossisk |
250 |