Project name |
Construction of the plant for the production and bottling of bottled water |
Location of the project |
Korenovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Required investments - 72 832,5 thousand rubles., Funding for the project is planned by the investor in full. Construction of the plant is planned for 1 year. The entire process of production will be reduced to a single technological chain. |
Project capacity |
water not aerated (0,5) – 1 870 thousand piece a year; water aerated (0,5) – 3 304,0 thousand a year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
72,8 mln. rubles |
Investment capacity, mln rubles |
72,8 mln. rubles |
Conditions of investor participation |
Direct investments |
Payback period |
4,2 |
Land characteristics |
Location |
Korenovskiy district g.Korenovsk Suvorov street (District CBM HCS) |
Land plot area (m2) |
30000 m2 |
Ground categories |
The earths of an agricultural purpose |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
2,37 mVt |
30 |
Gas supply |
10 mln. m3/year |
30 |
Water supply |
10 m3/day |
30 |
Sewerage system |
0,8 m3/day |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Korenovsk City |
2 |
Center of federal subject |
Krasnodar City |
65 |
Highway (regional, federal significance) |
Ì4 Don |
5 |
Roads of local significance |
Suvorov street |
0,05 |
Nearest railway station |
Korenovsk Station |
1 |
Nearest railway lines |
|
0,2 |
Airport |
Airport Krasnodar |
76 |
Seaport |
Novorossisk |
248 |