Construction of the plant for the production and bottling of bottled water

Project name Construction of the plant for the production and bottling of bottled water
Location of the project Korenovskiy district
Industry classification Agriculture
Basic information about the project
Project essence Required investments - 72 832,5 thousand rubles., Funding for the project is planned by the investor in full. Construction of the plant is planned for 1 year. The entire process of production will be reduced to a single technological chain.
Project capacity water not aerated (0,5) – 1 870 thousand piece a year; water aerated (0,5) – 3 304,0 thousand a year.
Financial estimation of the project
Total cost of the project, mln rubles 72,8 mln. rubles
Investment capacity, mln rubles 72,8 mln. rubles
Conditions of investor participation Direct investments
Payback period 4,2
Land characteristics
Location Korenovskiy district g.Korenovsk Suvorov street (District CBM HCS)
Land plot area (m2) 30000 m2
Ground categories The earths of an agricultural purpose
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 2,37 mVt 30
Gas supply 10 mln. m3/year 30
Water supply 10 m3/day 30
Sewerage system 0,8 m3/day
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Korenovsk City 2
Center of federal subject Krasnodar City 65
Highway (regional, federal significance) Ì4 Don 5
Roads of local significance Suvorov street 0,05
Nearest railway station Korenovsk Station 1
Nearest railway lines 0,2
Airport Airport Krasnodar 76
Seaport Novorossisk 248