Project name |
Construction of plant on sturgeon fish cultivation by the closed water supply method (2nd phase) |
Location of the project |
Goraychiy Kluych city |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Within the limits of the project Construction of plant on sturgeon fish cultivation by the closed water supply method (2nd phase)in village Saratovskaya power of 900000 kg and 75 000 kg of sturgeon caviar fishes is planned per a year |
Project capacity |
975 000 kg. |
Financial estimation of the project |
Total cost of the project, mln rubles |
2000 |
Investment capacity, mln rubles |
2000 |
Conditions of investor participation |
Direct investments |
Payback period |
4,7 |
Land characteristics |
Location |
353290, Goryachiy Klyuch city, Saratovskiy rural district, section 20 outline 46 |
Land plot area (m2) |
107000 sq.m |
Ground categories |
Land of industry |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Construction of station |
On the adjacent land plot |
Gas supply |
Independent station |
40 |
Water supply |
Dwelling |
40 |
Sewerage system |
Construction of independent cleaning facilities |
On the adjacent land plot |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Goryachiy Klyuch city |
7 |
Center of federal subject |
Krasnodar city |
35 |
Highway (regional, federal significance) |
FHW “Don” M-4 |
3 |
Roads of local significance |
Route “Saratovskaya - Kubanskaya” |
Shares the borders |
Nearest railway station |
Railway station in Saratovskaya village |
3,2 |
Nearest railway lines |
Railway station in Saratovskaya village |
3,2 |
Airport |
Krasnodar city |
45 |
Seaport |
Novorossiisk city |
160 |