Construction of plant on sturgeon fish cultivation by the closed water supply method (2nd phase)

Project name Construction of plant on sturgeon fish cultivation by the closed water supply method (2nd phase)
Location of the project Goraychiy Kluych city
Industry classification Agriculture
Basic information about the project
Project essence Within the limits of the project Construction of plant on sturgeon fish cultivation by the closed water supply method (2nd phase)in village Saratovskaya power of 900000 kg and 75 000 kg of sturgeon caviar fishes is planned per a year
Project capacity 975 000 kg.
Financial estimation of the project
Total cost of the project, mln rubles 2000
Investment capacity, mln rubles 2000
Conditions of investor participation Direct investments
Payback period 4,7
Land characteristics
Location 353290, Goryachiy Klyuch city, Saratovskiy rural district, section 20 outline 46
Land plot area (m2) 107000 sq.m
Ground categories Land of industry
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Construction of station On the adjacent land plot
Gas supply Independent station 40
Water supply Dwelling 40
Sewerage system Construction of independent cleaning facilities On the adjacent land plot
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Goryachiy Klyuch city 7
Center of federal subject Krasnodar city 35
Highway (regional, federal significance) FHW “Don” M-4 3
Roads of local significance Route “Saratovskaya - Kubanskaya” Shares the borders
Nearest railway station Railway station in Saratovskaya village 3,2
Nearest railway lines Railway station in Saratovskaya village 3,2
Airport Krasnodar city 45