Project name |
Construction of a mini-sausage plant |
Location of the project |
Belorechenskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
As part of the project realization it is planned to manufacture sausages “Ukrainskaya” and “Domashnaya”. The contents and technology of meat products are regulated by the relevant regulatory and technical documentation. |
Project capacity |
25 tons of finished products per year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
1.5 mln. rubles. |
Investment capacity, mln rubles |
1.5 mln. rubles. |
Conditions of investor participation |
direct investments. |
Payback period |
6.1 years. |
Land characteristics |
Location |
Krasnodar Region, Belorechensky District, Pshekhskoye rural settlement |
Land plot area (m2) |
3 000 sq.m. |
Ground categories |
lands of settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
35 kilovolts, “Pshekhskaya”, |
400 m |
Gas supply |
None |
|
Water supply |
None |
projection of the new water supply sources is required. |
Sewerage system |
None |
construction of the treatment facilities is required. |
Telephone penetration |
None |
construction of lines and structures of communication is required. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belorechensk City |
13.33 km |
Center of federal subject |
Krasnodar City |
108.3 km |
Highway (regional, federal significance) |
|
2 km |
Nearest railway station |
Belorechenskaya |
1.1 km |
Nearest railway lines |
|
1.1 km |
Airport |
Krasnodar City |
106.3 km |
Seaport |
Novorossiysk City |
243.3 km |