Construction of a stud farm

Project name Construction of a stud farm
Location of the project Novopokrovskiy district
Industry classification Agriculture
Basic information about the project
Project essence The main point of the project is the construction of a stud farm in Novoivanovskoye rural settlement.
Project capacity Production volume during the year: 20 stud-horses per year.
Financial estimation of the project
Total cost of the project, mln rubles 200 mil. rubles
Investment capacity, mln rubles 200 mil. rubles
Conditions of investor participation Direct investments
Payback period 5,4 year
Land characteristics
Location Municipality Novopokrovskiy District, , stanitsa Novoivanovskaya
Land plot area (m2) 200 000
Ground categories Lands of the settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 750
Gas supply -
Water supply 76 mm 900
Sewerage system airproof digestion tank
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Novopokrovskay 45 km
Center of federal subject City of Krasnodar 230 km
Highway (regional, federal significance) 45 km
Roads of local significance 2 km
Nearest railway station Station Ey 35 km
Nearest railway lines Station Ey 35 km
Airport City of Krasnodar 230 km
Seaport Novorossiysk 387 km