Project name |
Construction of a sunflower oilcake extraction plant |
Location of the project |
Novopokrovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
A construction of a sunflower oilcake extraction plant (of a second processing) is planned and the development of the sunflower-seed oil and schrot. |
Project capacity |
Production volume during the year: sunflower-seed oil – 1950 t schrot – 13 000 t |
Financial estimation of the project |
Total cost of the project, mln rubles |
11,4 mil. rubles |
Investment capacity, mln rubles |
11,4 mil. rubles |
Conditions of investor participation |
Direct investments |
Payback period |
5 year |
Land characteristics |
Location |
Municipality Novopokrovskiy District, Novopokrovskiy rural settlement, Novopokrovskaya village. |
Land plot area (m2) |
46 000 |
Ground categories |
Lands of the settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
|
350 |
Gas supply |
76 mm |
200 |
Water supply |
|
- |
Sewerage system |
|
airproof digestion tank |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Novopokrovskay |
3 |
Center of federal subject |
City of Krasnodar |
185 km |
Highway (regional, federal significance) |
|
0,5 km |
Roads of local significance |
|
- |
Nearest railway station |
Station Ey |
- |
Nearest railway lines |
Station Ey |
- |
Airport |
City of Krasnodar |
186 km |
Seaport |
Novorossiysk |
376 km |