Project name |
Construction of the mill, fumatory shop, warehouse in bowery Novenky. |
Location of the project |
Uspenskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of the mill, fumatory shop, warehouse is supposed. |
Project capacity |
– allocation of the mill with capacity of processing 15 tons a day, the fumitory shop 200-600 kg./day, construction of the hangar 60x50m. |
Financial estimation of the project |
Total cost of the project, mln rubles |
4,87 mln.rub |
Investment capacity, mln rubles |
4,87 mln.rub |
Conditions of investor participation |
Direct investment |
Payback period |
2 years |
Land characteristics |
Location |
Krasnodar region, Uspensky district, bowery Novenky, Lenina str., 29 a |
Land plot area (m2) |
2 000 sq.m. |
Ground categories |
Lands of settlement. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
TS 10/0,4 kW, 10 kW |
5 |
Gas supply |
- |
- |
Water supply |
imported |
- |
Sewerage system |
- |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
central part of the v.Uspenskoe |
22 |
Center of federal subject |
City Krasnodar |
250 |
Highway (regional, federal significance) |
Federal road “Caucasus” |
3 |
Roads of local significance |
«entrance to the city Armavir» |
0,5 |
Nearest railway station |
rail road station “Armavir-1” |
5,6 |
Nearest railway lines |
- |
4,8 |
Airport |
Airport – city Krasnodar |
230 |
Seaport |
city Novorossisk |
360 |