Project name |
Construction of the greenhouse complex |
Location of the project |
Slavianskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
As part of this project planned to build a greenhouse complex in the Slavic region of Krasnodar Territory, which will meet the needs of the population in fresh vegetables throughout the year |
Project capacity |
Tomatoes- 272000 kg / year; Cucumbers-260000 kg / year |
Financial estimation of the project |
Total cost of the project, mln rubles |
30 mln. rbl |
Investment capacity, mln rubles |
30 mln. rbl |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
4,9 Years |
Land characteristics |
Location |
Krasnodar region, Slavic area's. Solodkovsky Str. Gagarin, the territory of the former dairy |
Land plot area (m2) |
50 000 m2 |
Ground categories |
Earth settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Designed and constructed VL-10 kV (section, type of wire, the type of supports to determine the design) 2) to design and build the necessary number of VL-0, 4 kV wire CIP (conductor cross-section, the type of supports to determine the design) 3) to design and build the necessary number UTF 10 / 0,4 kV Performing the calculation of electrical networks for compliance with the parameters Power Quality (SCE)-GOST 13.109-97 |
|
Gas supply |
aboveground gas pipelines of high pressure in front SHGRPD-100mm |
|
Water supply |
individual artesian well |
|
Sewerage system |
To provide for the construction of waterproof rowed |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Center of federal subject |
Krasnodar |
110 |
Nearest railway station |
railway station "Protoka" Slaviansk-on-Kuban |
55 |
Airport |
Anapa |
130 |
Seaport |
Temryuk |
80 |