Project name |
The multipurpose complex |
Location of the project |
Pavlovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The construction of the greenhouse complex (glazed with reflective surfaces). |
Project capacity |
Production capacity can produce more than 12 000 tons of tomatoes and up to 6000 pieces of cups of green in a year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
16,5 mill. rbl |
Investment capacity, mln rubles |
16,5 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
1 year |
Land characteristics |
Location |
Krasnodar region, Pavlovsky District, North-western part of the village Novoplastunovskoy |
Land plot area (m2) |
50 000 (m2) |
Ground categories |
The grounds of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL10 kV |
250 |
Gas supply |
High Pressure Gas Pipeline DN = 100 mm |
400 |
Water supply |
Sewage d = 100 mm |
200 |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Pavlovskaya |
22 |
Center of federal subject |
Krasnodar city |
162 |
Highway (regional, federal significance) |
road of federal "Don" |
30,55 |
Roads of local significance |
- |
0,1 |
Nearest railway station |
Railway station «Sosyka – Eisk» |
22,9 |
Nearest railway lines |
- |
22 |
Airport |
The Krasnodar |
167 |
Seaport |
The Eisk |
162 |