Project name |
Sugar plant |
Location of the project |
Pavlovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Industrial production of crystalline white sugar beet |
Project capacity |
Sugar - 90 thousand tons in year Molasses - 21 thousand tons in year Beet pulp pellets - 60 thousand tons in year |
Financial estimation of the project |
Total cost of the project, mln rubles |
3000 mill. rbl |
Investment capacity, mln rubles |
3000 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
5 years |
Land characteristics |
Location |
Krasnodar Region, village Pavlovskaya, Southern Industrial Zone |
Land plot area (m2) |
666 000 (m2) |
Ground categories |
Plots of populated areas |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
The existing 35 kV overhead |
50 |
Gas supply |
Pipeline of high-pressure D 219 mm P = 6 bar of the site |
1335 |
Water supply |
Two existing boreholes |
1510 |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The Pavlovskaya |
within the boundaries of settlement |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
federal roads "Don" |
3,6 |
Roads of local significance |
- |
0,250 |
Nearest railway station |
Railway station«Sosyka –Rostov» |
1,200 |
Nearest railway lines |
- |
1,200 |
Airport |
The Krasnodar |
145 |
Seaport |
The Eisk |
140 |