Project name |
Beer factory |
Location of the project |
Pavlovskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The plant will be built on the latest technologies and equipped with modern facilities, which guarantees high quality products. |
Project capacity |
1064 dall in year |
Financial estimation of the project |
Total cost of the project, mln rubles |
29,5 mill. rbl |
Investment capacity, mln rubles |
29,5 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
1 year |
Land characteristics |
Location |
Krasnodar region, Pavlovsky District, Industrial Zone, southern part of the village Pavlovsk |
Land plot area (m2) |
50 000 (m2) |
Ground categories |
The grounds of a settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
35 kV |
35 |
Gas supply |
The gas supply will be carried out with output networks SDG village Pavlovsk adherence to the existing gas pipeline medium pressure 0,63 MPa |
595 |
Water supply |
Construction of artesian wells |
within the boundaries of the land |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The Pavlovskaya |
0,36 |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
road of federal "Don" |
4 |
Roads of local significance |
- |
0,05 |
Nearest railway station |
railway station " Sosyka - Eisk " |
2,5 |
Nearest railway lines |
- |
2 |
Airport |
Krasnodar |
145 |
Seaport |
Eisk |
140 |