Construction of the shop for primary milk processing

Project name Construction of the shop for primary milk processing
Location of the project Otradnenskiy district
Industry classification Agriculture
Basic information about the project
Project essence The project construction of shop for primary processing milk of 3 000 tons in day in village Otradnaya, Gogol street, 100, Otrad-nensky area is offered
Project capacity 3000 tons/day
Financial estimation of the project
Total cost of the project, mln rubles 10,875 mln. rub.
Investment capacity, mln rubles 10,875 mln. rub.
Conditions of investor participation Direct investment (100%)
Payback period 3,9 years
Land characteristics
Location Krasnodar region, Otradnensky area, village Otradnaya, street Go-gol, ¹100
Land plot area (m2) 10 000 sq. m.
Ground categories Settlement lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 111,8 kW 40 (necessary construction ÊÒP 160ÊVÀ, ëèíèè Line-10kV – 40 meters) Power source Substation 110/35/10kW «Otradnaya-110»
Gas supply High pressure gas line (6MPà) 20-25 meters (only after updating and the coordina-tion of the scheme of gas supply of village Otrad-naya)
Water supply Vseptic=20m3 In connection with absence of the necessary debit of water on a water supply point of a village Otrad-naya and absence of a water planting network in the given part of a village Otradnaya
Sewerage system Vseptic = 3,6 m3, Dpipe = 100-150 mm 5-6 from construction
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center village Otradnaya 0
Center of federal subject city Krasnodar 300
Highway (regional, federal significance) Rostov-on-Don – Makhachkala 80
Roads of local significance village Otradnaya – Udobnaya 0,325
Nearest railway station station “Armavir” 80
Nearest railway lines town Armavir 80
Airport town Armavir 80