Project name |
Construction of flour-grinding combine |
Location of the project |
Yeisk district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Within the limits of realization of the project construction of flour-grinding combine capable to make more than 26 thousand tons of a flour a year is planned |
Project capacity |
Manufacturing flour – 24 600 ton |
Financial estimation of the project |
Total cost of the project, mln rubles |
90 |
Investment capacity, mln rubles |
90 |
Conditions of investor participation |
Direct investments |
Payback period |
5,8 years |
Land characteristics |
Location |
Russia, Krasnodar region, Yeisky district, Aleksandrovskoe rural settlement, Railway travel, Aleksandrovskiy |
Land plot area (m2) |
35000 |
Ground categories |
Settlements land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
300 KVt, P/S110/35/10 Kv |
300 |
Gas supply |
6 kg/sm in a day O150 |
900 |
Water supply |
5 m3 in a day O150 |
900 |
Sewerage system |
Absent |
Construction local sewage water drain |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
ñity Yeisk |
5,5 |
Center of federal subject |
city Krasnodar |
235 |
Highway (regional, federal significance) |
Yeisk – Krasnodar |
1,5 |
Roads of local significance |
S. Aleksandrovka, Jeleznodorojnaya St |
1,5 |
Nearest railway station |
Railway travel Aleksandrovskaya |
2 |
Nearest railway lines |
Railway travel Aleksandrovskaya |
2 |
Airport |
City Yeisk |
15 |
Seaport |
City Yeisk |
16 |