Project name |
Construction grain elevator (volume of 40 000 ton) |
Location of the project |
Yeisk district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
According to the project is planning construction grain elevator volume of 40 000 ton) with annual volume overload 875 000 tons is planned |
Project capacity |
Annual: Services on formation of ship parties of grain - 875 000 tons |
Financial estimation of the project |
Total cost of the project, mln rubles |
350, 052 |
Investment capacity, mln rubles |
350, 052 |
Conditions of investor participation |
Direct investments |
Payback period |
6,2 |
Land characteristics |
Location |
Russia, Krasnodar territory, Yeisk district, s. Komsomolec, Sovetskata Str. |
Land plot area (m2) |
20 000 |
Ground categories |
Settlements land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
50 KVt, P/S 35/10 kvt |
260 |
Gas supply |
6 kg/sm in a day O150mm. |
50 |
Water supply |
10 cub. m. in a day O200mm. |
10 cub. m. in a day O200mm. |
Sewerage system |
Absent |
Construction local sewage water drain |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
ñity Yeisk |
10 |
Center of federal subject |
city Krasnodar |
235 |
Highway (regional, federal significance) |
Yeisk – Yasenskaya-Novominskaya |
1,6 |
Roads of local significance |
s. Komsomolec, Sovetskaya Str. |
0,1 |
Nearest railway station |
Railway station Yeisk |
18 |
Nearest railway lines |
Railway station Yeisk |
16 |
Airport |
City Yeisk |
15 |
Seaport |
City Yeisk |
15 |