Project name |
Construction of a factory on conservation of agricultural production |
Location of the project |
Primorsko-Akhtarskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of a factory on conservation leguminous and corn. |
Project capacity |
100 million jars in year |
Financial estimation of the project |
Total cost of the project, mln rubles |
166, 0358million rubbles |
Investment capacity, mln rubles |
166, 0358million rubbles |
Conditions of investor participation |
Direct investments |
Payback period |
3,5 years |
Land characteristics |
Location |
Krasnodar territory, Primorsko-Ahtarsk Rayon, Olginskaya settlement |
Land plot area (m2) |
45000 m2 |
Ground categories |
Grounds of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
10.0MWa |
From PS 35\10 kW substations, from existing HVL-10 kW |
Gas supply |
Pressure in a gas main up to 6kg/sm; D 100 mm |
200 m |
Water supply |
D 150 mm |
Existing water supply systems |
Sewerage system |
|
Existing water supply systems |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Primorsko-Akhtarsk |
30 km |
Center of federal subject |
Krasnodar |
163 km |
Highway (regional, federal significance) |
Primorsko-Akhtarsk - Krasnodar |
0,01 km |
Roads of local significance |
Primorsko-Akhtarsk - Timashevsk |
2 km |
Nearest railway station |
Train station “Olginskaya” |
0,5 km |
Nearest railway lines |
Primorsko-Akhtarsk - Timashevsk |
0,5 km |
Airport |
Krasnodar |
163 km |
Seaport |
Yeysk |
248 km |