Project name |
Construction of a factory for bottling of drinking water |
Location of the project |
Novokubanskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of a factory for bottling of drinking water: - The plant will be able to offer its customers drinking water that has passed strict quality control, all relevant environmental and functional standards |
Project capacity |
Construction of a factory for bottling drinking water capacity of 26,900 thousands tons of liters / year |
Financial estimation of the project |
Total cost of the project, mln rubles |
112,8 mln. Rub |
Investment capacity, mln rubles |
112,8 mln. Rub |
Conditions of investor participation |
Direct investments |
Payback period |
3,5 years |
Land characteristics |
Location |
Krasnodar region, Novokubansky area st.Prochnookopskaya, at a distance of 150 meters east of the street Novotroickoe |
Land plot area (m2) |
20000 sq. m. |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
PS 35/10kV "Prochnookopskaya" |
1000 |
Gas supply |
100 mm |
300 |
Water supply |
100 mm |
150 |
Sewerage system |
Local treatment facilities |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Novokubansk |
7 km |
Center of federal subject |
The city of Krasnodar |
207 km |
Highway (regional, federal significance) |
FAD «Kavkaz» |
13 km |
Roads of local significance |
village Prochnookopskaya - the city of Novokubansk |
2 km |
Nearest railway station |
Station Kuban |
16 km |
Nearest railway lines |
Station Kuban |
16 km |
Airport |
The city of Stavropol |
143 km |
Seaport |
City of Tuapse |
290 km |