Project name |
Meat processing complex |
Location of the project |
Tbilisskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of meat processing complex. Production of meat and sausage products |
Project capacity |
3650 tons a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
200 mln.rbl. |
Investment capacity, mln rubles |
200 mln.rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
2,6 years |
Land characteristics |
Location |
Western part of Tbilisskaya village |
Land plot area (m2) |
10 000 sq.m. |
Ground categories |
settlement land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from existing power station 110/35/10 kw |
1000 |
Gas supply |
from existing gas pipe with low pressure |
550 |
Water supply |
from existing water pipe d-76mm., free pressure in net – 1,5 atm. |
900 |
Sewerage system |
local |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Tbilisskaya village |
|
Center of federal subject |
Krasnodar city |
99 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
1 |
Roads of local significance |
existing motoroad with gravel surfacing comes to the plot |
0,7 |
Nearest railway station |
Grechishkino station |
3,6 |
Nearest railway lines |
Krasnodar-Kropotkin |
0,65 |
Airport |
Krasnodar airport |
90 |
Seaport |
Novorossiysk seaport |
280 |