Mini-bakery

Project name Mini-bakery
Location of the project Tbilisskiy district
Industry classification Agriculture
Basic information about the project
Project essence Construction of mini-bakery, production of bread and bakery products
Project capacity 640 thousand pieces a year
Financial estimation of the project
Total cost of the project, mln rubles 7,4 mln.rbl.
Investment capacity, mln rubles 7,4 mln.rbl.
Conditions of investor participation Direct investments
Payback period 5,5 year
Land characteristics
Location farm Zissermanovsky, 15 “A” Krasnaya street
Land plot area (m2) 2000 sq.m.
Ground categories settlement land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 110/35/10 kw 15
Gas supply from existing gas pipe with low pressure 20,5
Water supply from existing water pipe d-100 mm., free pressure in net – 1,5 atm. 15
Sewerage system local
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village 7,5
Center of federal subject Krasnodar city 109
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 12
Roads of local significance existing motoroad with gravel surfacing goes to the plot 1,4
Nearest railway station Grechishkino station 9,2
Nearest railway lines Krasnodar-Kropotkin 9,2
Airport Krasnodar airport 109
Seaport Novorossiysk seaport 289