Minielevator for primary processing and refinement of grain

Project name Minielevator for primary processing and refinement of grain
Location of the project Tihoretskiy district
Industry classification Agriculture
Basic information about the project
Project essence As part of the project is planned to service the elevator on the receipt, handling, storage and shipment of grain
Project capacity The production capacity exceeds the volume of sales, providing break-even enterprise activity, which indicates the presence of the stock of financial strength
Financial estimation of the project
Total cost of the project, mln rubles 27,8 million rubles
Investment capacity, mln rubles 27,8 million rubles
Conditions of investor participation Direct investment in 100% of
Payback period 5,8 years
Land characteristics
Location Krasnodar region, Tikhoretsky District, the Arkhangelsk rural settlement, village. Malorossiysky in the area of \"sugar factory\" Malorossiysky
Land plot area (m2) 22 000 sq
Ground categories Earth settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Must design and construction of 35/10 kV substation TP-C-9-360 -
Gas supply Connecting to gas networks may carry on the feeding pipeline D 225 mm to \"sugar factory\" Malorossiysky 390
Water supply On the territory of JSC \"Sugar Mill\" Tikhoretsky \"has its own water system, which includes nine artesian wells 140
Sewerage system Building your own sewers with septic tanks -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center City Tikhoretsk 35
Center of federal subject Krasnodar ñity 217
Highway (regional, federal significance) FAD \"Caucasus\" 32
Roads of local significance pos. Malorossiysky 0,01
Nearest railway station Art. Arkhangelsk 35
Nearest railway lines Art. Arkhangelsk 3,1
Airport Krasnodar 217
Seaport Yeisk 231