Project name |
Construction of vegetable growth hothouse complex |
Location of the project |
Kurganinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Project includes the construction of hothouses and other structure |
Project capacity |
Total output volume is 653,4 tonnes of vegetables |
Financial estimation of the project |
Total cost of the project, mln rubles |
26,667 mln.rub |
Investment capacity, mln rubles |
26,667 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
3,2 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, Rodnikovskoe highway,16 |
Land plot area (m2) |
19 900 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From the operating VL-10 kilovolt |
9500 |
Gas supply |
heat supply from power supply |
- |
Water supply |
tubular well construction |
At the land plot |
Sewerage system |
local purification plants construction |
At the land plot |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
170 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,20 |
Roads of local significance |
Rodnikovskoe highway |
0,20 |
Nearest railway station |
Kurgannaya station |
7,7 |
Nearest railway lines |
Kurganinsk-Shedok |
1,4 |
Airport |
Krasnodar city |
170 |
Seaport |
Tuapse city |
350 |