Project name |
Construction of hothouse complex |
Location of the project |
Kurganinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Object construction includes the construction of: laboratory, administrative module, hothouses, ground for classification and temporal storage of product. Product is tomatoes, cucumbers, salad, sweet peper |
Project capacity |
Planned total production volume is 1300 tonnes |
Financial estimation of the project |
Total cost of the project, mln rubles |
28,077 mln.rub |
Investment capacity, mln rubles |
28,077 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
5 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district, h.Krasniy, approximately in 25 m in the north-east of the house on the Chkalova street, 10 |
Land plot area (m2) |
35 000 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-0,4 Kv L-2 KTP Km-2 412 pylon ¹22 |
770 |
Gas supply |
It is necessary to do a heat engineering account and get permission of the Energy department of Krasnodar region for gas usage as a fuel |
- |
Water supply |
Tubular well (8 ones) |
At the land spot |
Sewerage system |
Not required |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
13,0 |
Center of federal subject |
Krasnodar city |
165,0 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
7,0 |
Roads of local significance |
Sinuhinskaya street |
0,01 |
Nearest railway station |
Kurgannaya station |
17,0 |
Nearest railway lines |
Armavir-Tuapse |
15,0 |
Airport |
Krasnodar city |
168,0 |
Seaport |
Tuapse city |
350,0 |