Construction of hothouse complex

Project name Construction of hothouse complex
Location of the project Kurganinskiy district
Industry classification Agriculture
Basic information about the project
Project essence Object construction includes the construction of: laboratory, administrative module, hothouses, ground for classification and temporal storage of product. Product is tomatoes, cucumbers, salad, sweet peper
Project capacity Planned total production volume is 1300 tonnes
Financial estimation of the project
Total cost of the project, mln rubles 28,077 mln.rub
Investment capacity, mln rubles 28,077 mln.rub
Conditions of investor participation Direct investments
Payback period 5 years
Land characteristics
Location Krasnodar region, Kurganinsky district, h.Krasniy, approximately in 25 m in the north-east of the house on the Chkalova street, 10
Land plot area (m2) 35 000 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL-0,4 Kv L-2 KTP Km-2 412 pylon ¹22 770
Gas supply It is necessary to do a heat engineering account and get permission of the Energy department of Krasnodar region for gas usage as a fuel -
Water supply Tubular well (8 ones) At the land spot
Sewerage system Not required -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 13,0
Center of federal subject Krasnodar city 165,0
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 7,0
Roads of local significance Sinuhinskaya street 0,01
Nearest railway station Kurgannaya station 17,0
Nearest railway lines Armavir-Tuapse 15,0
Airport Krasnodar city 168,0
Seaport Tuapse city 350,0