Project name |
Berry and fruit trees garden |
Location of the project |
Kurganinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The project provides construction of buildings and constructions, branch for cultivation of fruiters. |
Project capacity |
Total volume of berry and fruit production in the 5 year after planting is 38 tonnes |
Financial estimation of the project |
Total cost of the project, mln rubles |
3,088 mln. rub |
Investment capacity, mln rubles |
3,088 mln. rub |
Conditions of investor participation |
Direct investments |
Payback period |
5,7 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, Ostrovskogo street, 131 |
Land plot area (m2) |
15 000 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
15 kVt, TP construction |
350,0 |
Gas supply |
Not required |
- |
Water supply |
From the operating water supply system on the crossing Pervomayskaya street and Homyakova street, pipe diameter 100mm |
250,0 |
Sewerage system |
In the concrete septic system with the following removal |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
173,8 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,9 |
Roads of local significance |
Pervomayskaya street |
0,1 |
Nearest railway station |
Kurgannaya station |
3,8 |
Nearest railway lines |
Armavir-Tuapse |
0,4 |
Airport |
Krasnodar city |
176,8 |
Seaport |
Tuapse city |
350 |