Berry and fruit trees garden

Project name Berry and fruit trees garden
Location of the project Kurganinskiy district
Industry classification Agriculture
Basic information about the project
Project essence The project provides construction of buildings and constructions, branch for cultivation of fruiters.
Project capacity Total volume of berry and fruit production in the 5 year after planting is 38 tonnes
Financial estimation of the project
Total cost of the project, mln rubles 3,088 mln. rub
Investment capacity, mln rubles 3,088 mln. rub
Conditions of investor participation Direct investments
Payback period 5,7 years
Land characteristics
Location Krasnodar region, Kurganinsky district,Kurganinsk town, Ostrovskogo street, 131
Land plot area (m2) 15 000 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 15 kVt, TP construction 350,0
Gas supply Not required -
Water supply From the operating water supply system on the crossing Pervomayskaya street and Homyakova street, pipe diameter 100mm 250,0
Sewerage system In the concrete septic system with the following removal -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 0
Center of federal subject Krasnodar city 173,8
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 0,9
Roads of local significance Pervomayskaya street 0,1
Nearest railway station Kurgannaya station 3,8
Nearest railway lines Armavir-Tuapse 0,4
Airport Krasnodar city 176,8
Seaport Tuapse city 350