Project name |
Nursery garden for transplant growth |
Location of the project |
Kurganinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Project includes the nursery garden planning: separation of matrix plantation, transplant separation for growth, construction of structure |
Project capacity |
Supposed volume of production is 20 000 berry trees transplants and 30 000 fruit tree transplants |
Financial estimation of the project |
Total cost of the project, mln rubles |
6,093 mln. rub |
Investment capacity, mln rubles |
6,093 mln. rub |
Conditions of investor participation |
Direct investments |
Payback period |
3 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, Rodnikovskoe highway, 9 |
Land plot area (m2) |
15 280 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10 kV Kv-3 op.¹15 from PS 35/10 kV “Kavkaz” |
50,0 |
Gas supply |
heat supply from power supply |
- |
Water supply |
From the operating water supply system on the crossing Lenina street and Solnechnaya street |
740 |
Sewerage system |
In the operating sewerage system on the crossing Lenina street and Chapaeva street |
1200 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
177,5 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,15 |
Roads of local significance |
Rodnikovskoe highway |
0,15 |
Nearest railway station |
Kurgannaya station |
7,5 |
Nearest railway lines |
Kurganinsk-Shedok |
1,2 |
Airport |
Krasnodar city |
180,5 |
Seaport |
Tuapse city |
350 |