Factory building on processing of vegetables and fruit

Project name Factory building on processing of vegetables and fruit
Location of the project Gulkevichskiy district
Industry classification Agriculture
Basic information about the project
Project essence Factory building on manufacture of juice from vegetables and fruit, a tomato paste, jams and other canning production from vegetables and fruit with volume of processing of 2350 tons of vegetables and 2650 tons of fruit
Project capacity 11,5 million conditional banks canning production
Financial estimation of the project
Total cost of the project, mln rubles 128,2
Investment capacity, mln rubles 128,2
Conditions of investor participation Direct investments
Payback period 5,5 years
Land characteristics
Location Krasnodar region, Gulkevichi city, the Western microdistrict-2
Land plot area (m2) 32000 Sq. m
Ground categories the earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Lines 10 kW Define by projecting
Gas supply High pressure D 100 mm 275 m
Water supply D 100 mm 420 m
Sewerage system D 200 mm 250 m
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Gulkevichi city It is located on a city territory
Center of federal subject Krasnodar city 165
Highway (regional, federal significance) Ì29 Rostow-Mahachkala 5
Roads of local significance Gulkevichi-Kropotkin 0,05
Nearest railway station station Gulkevichi 3
Nearest railway lines station Gulkevichi 3
Airport Krasnodar city 165
Seaport Novorossisk city 314