Project name |
Factory building on processing of vegetables and fruit |
Location of the project |
Gulkevichskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Factory building on manufacture of juice from vegetables and fruit, a tomato paste, jams and other canning production from vegetables and fruit with volume of processing of 2350 tons of vegetables and 2650 tons of fruit |
Project capacity |
11,5 million conditional banks canning production |
Financial estimation of the project |
Total cost of the project, mln rubles |
128,2 |
Investment capacity, mln rubles |
128,2 |
Conditions of investor participation |
Direct investments |
Payback period |
5,5 years |
Land characteristics |
Location |
Krasnodar region, Gulkevichi city, the Western microdistrict-2 |
Land plot area (m2) |
32000 Sq. m |
Ground categories |
the earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Lines 10 kW |
Define by projecting |
Gas supply |
High pressure D 100 mm |
275 m |
Water supply |
D 100 mm |
420 m |
Sewerage system |
D 200 mm |
250 m |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Gulkevichi city |
It is located on a city territory |
Center of federal subject |
Krasnodar city |
165 |
Highway (regional, federal significance) |
Ì29 Rostow-Mahachkala |
5 |
Roads of local significance |
Gulkevichi-Kropotkin |
0,05 |
Nearest railway station |
station Gulkevichi |
3 |
Nearest railway lines |
station Gulkevichi |
3 |
Airport |
Krasnodar city |
165 |
Seaport |
Novorossisk city |
314 |