Mini grain elevator construction

Project name Mini grain elevator construction
Location of the project Kurganinskiy district
Industry classification Agriculture
Basic information about the project
Project essence Structure construction, technical equipment buying, carrying out a primary developed works, staff reception are required for grain elevator operation
Project capacity Dispatch and storage of grain crops with the productive volume of 30 000 tones at ones
Financial estimation of the project
Total cost of the project, mln rubles 103,922 mln.rub.
Investment capacity, mln rubles 103,922 mln.rub.
Conditions of investor participation Direct investments
Payback period 2,9 years
Land characteristics
Location Krasnodar region, Kurganinsky district, Kurganinsk town, Mihailovskoe highway,21
Land plot area (m2) 15 000 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL-10 kV 50,0
Gas supply From the operating high pressure gas pipeline on the Mihailovskoe highway, steel pipe diameter 100 mm 800,0
Water supply From the operating water supply system on the crossing of Shosseinaya street and Zavodskaya street steel pipe diameter 100 mm 1600,0
Sewerage system In the operating sewerage system on the crossing Shosseinaya street and Zavodskaya street a/c pipe diameter 200 mm 1600,0
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 0
Center of federal subject Krasnodar city 168,6
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 0,8
Roads of local significance Mihailovskoe highway 0,8
Nearest railway station Kurgannaya station 4,05
Nearest railway lines Kurganinsk-Shedok 2,0
Airport Krasnodar city 171,6
Seaport Tuapse city 350