Project name |
Construction of a drying raw materials shop |
Location of the project |
Armavir Ñity |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Fulfillment of the project assumes a building of the complex to process kernel goods. Its advantage is to have a non-waste production. Compared to ordinary canneries this complex is planned to process not only soft fruits but kernels to produce powder, oil and activated carbon. |
Project capacity |
The project assumes building of production and subsidiary buildings where it will be located - 4 production shops - a canning shop; - kernel powder shop; - activated carbon shop; - kernel oil shop - a ready made goods shop; - a raw material warehouse - a laboratory ; - engineering technical facilities |
Financial estimation of the project |
Total cost of the project, mln rubles |
63 mln.roubles |
Investment capacity, mln rubles |
63 mln.roubles |
Conditions of investor participation |
Direct investments |
Payback period |
3,4 years |
Land characteristics |
Location |
Armavir, Northern industrial zone |
Land plot area (m2) |
8 000 m2. |
Ground categories |
Land of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 6 kWatt |
30 |
Gas supply |
D=325 |
230 |
Water supply |
D =250 |
60. |
Sewerage system |
D= 300 |
452 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The central part of Armavir |
6,0 |
Center of federal subject |
Armavir |
250 |
Highway (regional, federal significance) |
FAD «Caucasus» |
3,8 |
Roads of local significance |
«an entrance to Armavir» |
Along the board site |
Nearest railway station |
Railway station «Armavir-1», Railway station «Armavir-2» |
7,0 , 6,8 |
Nearest railway lines |
|
0,5 |
Airport |
Airport of Krasnodar |
200 |
Seaport |
Novorossijsk |
360 |