Project name |
Processing Milk Factory placement, Ust-Labinsk |
Location of the project |
Ust- Labinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Processing milk factory, capacity of 200 tons per day, will be the modern hi-tech enterprise combining the advanced equipment, the thought over architectural - technological circuit and the methods of work focused on high economic and financial results. |
Project capacity |
200 tons of milk per day |
Financial estimation of the project |
Total cost of the project, mln rubles |
700 mln. Rub |
Investment capacity, mln rubles |
700 mln. Rub |
Conditions of investor participation |
Direct investments |
Payback period |
2.7 years |
Land characteristics |
Location |
Krasnodar region, Ust-Labinsk district t. Ust-Labinskthe (Northern part) |
Land plot area (m2) |
55 000 (sq.ì.) |
Ground categories |
Area of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
2800 kilowatt |
800 m from a projected ÒÏ 2x25ÌÂÀ |
Gas supply |
d325 mm; (1045cubic meters per hour) |
700 m from a projected gas main |
Water supply |
d100 mm 2 ÀÒÌ; Capacity - 4,0 thousand cubic meters per day |
700 m from an under construction water supply point |
Sewerage system |
d300 mm |
100 m |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
t. Ust-Labinsk |
3 |
Center of federal subject |
Krasnodar city |
65 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
1 |
Roads of local significance |
Volnaya Str. |
1 |
Nearest railway station |
Ust-Labinskaya |
1,6 |
Nearest railway lines |
t. Ust-Labinsk |
1,6 |
Airport |
c. Krasnodar |
50 |
Seaport |
c. Novorossiysk |
230 |