Project name |
Economy building on cultivation of a trout |
Location of the project |
Apsheronskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Saturation of a commodity market by high-quality non-polluting production |
Project capacity |
85 T trout meat in a year 1,7 T trout caviar in a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
10 |
Investment capacity, mln rubles |
10 |
Conditions of investor participation |
Direct investments |
Payback period |
5 years |
Land characteristics |
Location |
Municipal formation Apsheronsk area, the Nigegorodskoe rural settlement |
Land plot area (m2) |
Land plot area 4647 |
Ground categories |
The earths of a stock |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Connection from E-10 kv Np 7 E 10 kv\"Nizhiygorod\" |
300-500 |
Gas supply |
It is not required |
|
Water supply |
The centralised water supply is absent |
The device is necessary mine wells for technical needs probably use of water from the river of Kurdzhips |
Sewerage system |
The centralised water removal is absent |
The device of local system of clearing is necessary |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Apsheronsk |
30 |
Center of federal subject |
The city of Krasnodar |
140 |
Highway (regional, federal significance) |
Highway Maikop-Tuapse |
23 |
Roads of local significance |
Highway Apsheronsk-Nizhniy Novgorod |
0,02 |
Nearest railway station |
The city of Apsheronsk |
35 |
Nearest railway lines |
|
35 |
Airport |
Krasnodar |
140 |
Seaport |
Tuapse |
123 |