Project name |
Organization greenhouses |
Location of the project |
Abinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The project involves the construction of the greenhouse complex, which is planned to grow vegetables year-round |
Project capacity |
700 tonns |
Financial estimation of the project |
Total cost of the project, mln rubles |
50 |
Investment capacity, mln rubles |
50 |
Conditions of investor participation |
Direct investments, extra means |
Payback period |
1 year 7 months. |
Land characteristics |
Location |
Southern suburb of the item Fedorovsky |
Land plot area (m2) |
40000 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from the existing transmission lines (VL 0,4 kW) |
300 |
Gas supply |
village pipeline (diameter - 100 mm) |
300 |
Water supply |
no |
installation of a water tower |
Sewerage system |
no |
local treatment facilities construction septic tanks |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Abinsk |
80 |
Center of federal subject |
city Krasnodar |
40 |
Highway (regional, federal significance) |
The highway Krasnodar - Novorossisk |
60 |
Roads of local significance |
Aren’t present |
Nearby |
Nearest railway station |
Abinsky-linear |
80, 70 |
Nearest railway lines |
Krasnodar-Novorossisk |
55 |
Airport |
Krasnodar Anapa |
60, 150 |
Seaport |
Novorossisk, Temryuk |
150, 190 |