Project name |
Building of drugstore |
Location of the project |
Kalininskiy district |
Industry classification |
Social sphere |
Basic information about the project |
Project essence |
Building of drugstore in stanitsa Starovelichkovskaya in floor area ì2 |
Project capacity |
Annual profit is 4500 thousand rub. |
Financial estimation of the project |
Total cost of the project, mln rubles |
2,36 mln. rub |
Investment capacity, mln rubles |
2,36 mln. rub |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
2,6 years |
Land characteristics |
Location |
Land plot locates in stanitsa Starovelichkovskaya along highway Kalininskaya-Novotitarovskaya, km 5+590 (on the left side) |
Land plot area (m2) |
1000 square meters |
Ground categories |
Settlement land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From substation 35/10 kV “Starovelichkovskaya” overhead power line -10 kV SV – 5, package transformer substation 10/04 kW |
70 |
Gas supply |
110 mm |
40 |
Water supply |
110 mm, water pressure 1,2 atm. |
150 |
Sewerage system |
- |
Projected septic |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Stanitsa Kalininskaya |
10 |
Center of federal subject |
Krasnodar |
60 |
Highway (regional, federal significance) |
Kalininskaya-Novotitarovskaya |
0,05 |
Roads of local significance |
Gorodskaya street |
0,05 |
Nearest railway station |
Station “Velichkovka” |
1 |
Nearest railway lines |
Stanitsa Starovelichkovskaya |
1 |
Airport |
Krasnodar |
65 |
Seaport |
Novorossiysk |
140 |