Building of the treatment-and-prophylactic centre

Project name Building of the treatment-and-prophylactic centre
Location of the project Krimskiy district
Industry classification Social sphere
Basic information about the project
Project essence The offered treatment-and-prophylactic centre will include: Placing: a hotel complex on 30 places. A food: cafe, a bar. The medical centre: balneotherapy, physiotherapy, functional diagnostics. The SPA-centre: a beauty salon. The entertaining centre.
Project capacity The first stage (2012) rendering 11286 Units of services The second stage (2013)- 16359 Units of services The third stage (2014)- 19751 Units of services
Financial estimation of the project
Total cost of the project, mln rubles 29,476 million rbl.
Investment capacity, mln rubles 29,476 million rbl.
Conditions of investor participation Direct investments
Payback period 4,0 years
Land characteristics
Location The Krymsk area, Kiev rural settlement, in two kilometres from with. Kiev
Land plot area (m2) 5 000 sq.m.
Ground categories The earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 0,21 MW Technological joining probably to carry out from PS 110 kV \"Nikitinsky\" under the contract technological prisoedinenija. - 7500 m
Gas supply 0,096 mil.m3/year, Dm-200mm Connection-g/d on the item of Damanka, distance to a point — 1000 m
Water supply 4,3 m3/days Building of own water fence is necessary.
Sewerage system No, the device of cesspools No
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Krymsk 18
Center of federal subject The city of Krasnodar 120
Highway (regional, federal significance) Krymsk-Dzhiginka 2
Roads of local significance Lvovskiy 2
Nearest railway station The item Kievsky 3
Nearest railway lines Ry on Anapa 2
Airport Anapa 65
Seaport Novorossijsk 70