Project name |
Reconstruction of purifying system in the village Otradnaya |
Location of the project |
Otradnenskiy district |
Industry classification |
Housing and communal services |
Basic information about the project |
Project essence |
Essence of the project is construction of purifying constructions, reception of profit, development of an infrastructure of area, the organization of additional workplaces and efficiency of the budget of region and municipality from the given project. Construction is planned to carry out in two stages. At the first stage building of constructions by the general productivity 2700 cubes\day is supposed, the second stage considers delivery and in-stallation of the additional equipment of productivity on 1500 cubes\day. The general capacity will make 4200c.m./day. |
Project capacity |
4200 c.m./ day. |
Financial estimation of the project |
Total cost of the project, mln rubles |
108,0 mln. rub. |
Investment capacity, mln rubles |
106,5 mln. rub. |
Conditions of investor participation |
Direct investment (99%) |
Payback period |
12,3 years |
Land characteristics |
Location |
Otradnensky district village Otradnaya, street Stepnaya |
Land plot area (m2) |
105 000 sq. m. |
Ground categories |
Industrial lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
The first independent power supply: On Substation-110/35/10kW "O" in Distribu-tion device -10 1-st section of bars to pro-vide installation of an additional cell of the vacuum switch 10 kW. Construction of new line-10kW. The second independent power supply: from line -10kW ÎÒ11, fed from Substa-tion -35/10ê "OT", having link on a line 35kW with the second section of bars 35kW Substation -110/35/10ê "O" to provide installation of a cell of the account 10kW on border of section on the part 10kW. It is required to make reconstruction of a cell of the oil switch ÎÒ11 on Substation-35/10kW "OT" by replacement of a cell of the oil switch by the vacuum switch. The third independent power supply: to provide on object installation of Diesel Power station. The maximal loading: 176,0 kW/380V |
1. 260, 2. 120, 3. 0 |
Gas supply |
Existing gas line of high pressure |
1000 (after updating the general scheme of gas supply of village Otradnaya) |
Water supply |
Vtank=20m3 |
0 (in connection with absence of the necessary debit of water on a water-fence of village Otradnaya it is necessary to provide an in-dependent source of water supply) |
Sewerage system |
- |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Center of federal subject |
city Krasnodar |
300 |
Highway (regional, federal significance) |
Rostov-on-Don – Makhachkala |
80 |
Roads of local significance |
village Otradnaya – settlement Muravyi |
0,26 |
Nearest railway station |
town Armavir |
80 |
Nearest railway lines |
town Armavir |
80 |
Airport |
town Armavir |
80 |
Seaport |
town Novorossiysk |
440 |