Reconstruction of purifying system in the village Otradnaya

Project name Reconstruction of purifying system in the village Otradnaya
Location of the project Otradnenskiy district
Industry classification Housing and communal services
Basic information about the project
Project essence Essence of the project is construction of purifying constructions, reception of profit, development of an infrastructure of area, the organization of additional workplaces and efficiency of the budget of region and municipality from the given project. Construction is planned to carry out in two stages. At the first stage building of constructions by the general productivity 2700 cubes\day is supposed, the second stage considers delivery and in-stallation of the additional equipment of productivity on 1500 cubes\day. The general capacity will make 4200c.m./day.
Project capacity 4200 c.m./ day.
Financial estimation of the project
Total cost of the project, mln rubles 108,0 mln. rub.
Investment capacity, mln rubles 106,5 mln. rub.
Conditions of investor participation Direct investment (99%)
Payback period 12,3 years
Land characteristics
Location Otradnensky district village Otradnaya, street Stepnaya
Land plot area (m2) 105 000 sq. m.
Ground categories Industrial lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply The first independent power supply: On Substation-110/35/10kW "O" in Distribu-tion device -10 1-st section of bars to pro-vide installation of an additional cell of the vacuum switch 10 kW. Construction of new line-10kW. The second independent power supply: from line -10kW ÎÒ11, fed from Substa-tion -35/10ê "OT", having link on a line 35kW with the second section of bars 35kW Substation -110/35/10ê "O" to provide installation of a cell of the account 10kW on border of section on the part 10kW. It is required to make reconstruction of a cell of the oil switch ÎÒ11 on Substation-35/10kW "OT" by replacement of a cell of the oil switch by the vacuum switch. The third independent power supply: to provide on object installation of Diesel Power station. The maximal loading: 176,0 kW/380V 1. 260, 2. 120, 3. 0
Gas supply Existing gas line of high pressure 1000 (after updating the general scheme of gas supply of village Otradnaya)
Water supply Vtank=20m3 0 (in connection with absence of the necessary debit of water on a water-fence of village Otradnaya it is necessary to provide an in-dependent source of water supply)
Sewerage system - -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Center of federal subject city Krasnodar 300
Highway (regional, federal significance) Rostov-on-Don – Makhachkala 80
Roads of local significance village Otradnaya – settlement Muravyi 0,26
Nearest railway station town Armavir 80
Nearest railway lines town Armavir 80
Airport town Armavir 80
Seaport town Novorossiysk 440