Construction of MSW landfill waste sorting station

Project name Construction of MSW landfill waste sorting station
Location of the project Gulkevichskiy district
Industry classification Housing and communal services
Basic information about the project
Project essence Construction of MSW landfill waste sorting station in Gulkevichsky district, whose power will also provide collection and disposal of waste from g.Kropotkina and the Caucasus region.
Project capacity 40,000 tons
Financial estimation of the project
Total cost of the project, mln rubles 80,566
Investment capacity, mln rubles 80,566
Conditions of investor participation Direct investments
Payback period 80,566
Land characteristics
Location Krasnodar region, Gulkevichsky district Sokolovskoye rural settlement, w.Mashevsky, approximately 550 m south-east of the clubhouse
Land plot area (m2) 90206 Sq. m
Ground categories the earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 10 kV high voltage 390
Gas supply No -
Water supply Artskvazhina D 250 mm depth of 40 m capacity of 2 cubic Settles down on a site
Sewerage system Septic from three wells with total capacity of 45 cubic meters. m with a coefficient of filtration at least 1 m per day: 2 wells D 700 mm 1 well D 2000 mm depth of 11,5 m Settles down on a site
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Gulkevichi city 7
Center of federal subject Krasnodar city 172
Highway (regional, federal significance) Ì29 Rostow-Mahachkala 0.3
Roads of local significance Gulkevichi-Kropotkin 0.3
Nearest railway station station Gulkevichi 9
Nearest railway lines station Gulkevichi 9
Airport Krasnodar city 172
Seaport Novorossisk city 221