Project name |
Construction of a mini-factory on sorting dust and range of firm household waste products |
Location of the project |
Kurganinskiy district |
Industry classification |
Housing and communal services |
Basic information about the project |
Project essence |
Construction of a basic building, Construction and installation of other constructions, the organization of communications and purchase of the equipment |
Project capacity |
The project considers an annual designed capacity of manufacture of 100 thousand tons. |
Financial estimation of the project |
Total cost of the project, mln rubles |
177,552 mln. rub |
Investment capacity, mln rubles |
177, 552ìëí. ðóá. |
Conditions of investor participation |
Direct investments |
Payback period |
5,5 years |
Land characteristics |
Location |
Krasnodar territory, area Kurganinsky, city. Kurganinsk, street Stanichnaja, 10 |
Land plot area (m2) |
70 000 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From existing VL 10 kV feeder ÌÎÊ - 5 PS 35/10 kV \"ÌÎÊ\" |
1500 |
Gas supply |
Not required |
- |
Water supply |
Not required |
- |
Sewerage system |
Not required |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
- |
Center of federal subject |
Krasnodar city |
167,0 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
2,3 |
Roads of local significance |
Highway Mihajlovskoe |
2,3 |
Nearest railway station |
Kurgannaya station |
7,6 |
Nearest railway lines |
Kurganinsk-Tuapse |
3,0 |
Airport |
Krasnodar city |
170,0 |
Seaport |
Tuapse city |
350,0 |