Construction of a mini-factory on sorting dust and range of firm household waste products

Project name Construction of a mini-factory on sorting dust and range of firm household waste products
Location of the project Kurganinskiy district
Industry classification Housing and communal services
Basic information about the project
Project essence Construction of a basic building, Construction and installation of other constructions, the organization of communications and purchase of the equipment
Project capacity The project considers an annual designed capacity of manufacture of 100 thousand tons.
Financial estimation of the project
Total cost of the project, mln rubles 177,552 mln. rub
Investment capacity, mln rubles 177, 552ìëí. ðóá.
Conditions of investor participation Direct investments
Payback period 5,5 years
Land characteristics
Location Krasnodar territory, area Kurganinsky, city. Kurganinsk, street Stanichnaja, 10
Land plot area (m2) 70 000 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply From existing VL 10 kV feeder ÌÎÊ - 5 PS 35/10 kV \"ÌÎÊ\" 1500
Gas supply Not required -
Water supply Not required -
Sewerage system Not required -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town -
Center of federal subject Krasnodar city 167,0
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 2,3
Roads of local significance Highway Mihajlovskoe 2,3
Nearest railway station Kurgannaya station 7,6
Nearest railway lines Kurganinsk-Tuapse 3,0
Airport Krasnodar city 170,0
Seaport Tuapse city 350,0