Self-flown Sewage Collector Building (pipe range 15,6 km), the Northern part of Ust-Labinsk

Project name Self-flown Sewage Collector Building (pipe range 15,6 km), the Northern part of Ust-Labinsk
Location of the project Ust- Labinskiy district
Industry classification Housing and communal services
Basic information about the project
Project essence The project is supposed building of a new Self-flown Sewage Collector (pipe range 15,6 km),in the Northern part of Ust-Labinsk
Project capacity 2 555 thousand cubic meters/year
Financial estimation of the project
Total cost of the project, mln rubles 259,6 mln. Rub
Investment capacity, mln rubles 259,6 mln. Rub
Conditions of investor participation Direct investments
Payback period 7,8 years
Land characteristics
Location Krasnodar region, Ust-Labinsk district, Ust-Labinsk
Land plot area (m2) 460 146 (sq.ì.)
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 80 kW 4500
Gas supply - is not required
Water supply - is not required
Sewerage system - is not required
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center t. Ust-Labinsk 3
Center of federal subject Krasnodar city 67
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 0,7
Roads of local significance Volnaya Str. 1
Nearest railway station Ust-Labinskaya 2,6
Nearest railway lines t. Ust-Labinsk 1,2
Airport c. Krasnodar 53
Seaport c. Novorossiysk 233