Project name |
Construction of the prefabricated housing (cottages, town houses) |
Location of the project |
Kanevskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
The project envisages construction of the 1.5-storey, 2-storey and 3-storey houses of 150-300 sq.m. |
Project capacity |
141.9 million rubles |
Financial estimation of the project |
Total cost of the project, mln rubles |
99.98 million rubles |
Investment capacity, mln rubles |
99.98 million rubles |
Conditions of investor participation |
Direct investments |
Basic indicators of investment project economic efficiency |
Simple payback time |
3 years |
Land characteristics |
Location |
Krasnodar Region, Kanevskoy District, Kanevskaya village, southern residential area |
Land plot area (m2) |
56,000 sq.m. |
Ground categories |
Lands of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
A 110/35/10 kV substation of “Gazoapparat”, a high-voltage line GZ-7kV |
230 |
Gas supply |
An existing gas distribution station |
875 |
Water supply |
From the existing water pipeline at Vysotskogo Street with a loopback, diameter — 110mm. |
30 |
Sewerage system |
Projection of a self-drain sewer and connecting it to the designed sewage pumping station |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kanevskaya village |
- |
Center of federal subject |
Krasnodar City |
120 |
Highway (regional, federal significance) |
“Krasnodar - Yeisk” |
5 |
Roads of local significance |
“Kanevskaya-Pridorozhnaya” |
0,05 |
Nearest railway station |
Kanevskaya station |
1 |
Nearest railway lines |
Kanevskaya railroad |
0,05 |
Airport |
Krasnodar City |
135 |
Seaport |
Yeisk City |
120 |