Project name |
Building of manystoried settlements in 17/5 Shkol-naya street with the buildings of untenable assign-ment at the land plot, the area of which is 5622 sq.m. |
Location of the project |
Krasnodar city |
Industry classification |
House building |
Basic information about the project |
Project essence |
Building of manystoried settlements in 17/5 Shkol-naya street with the buildings of untenable assign-ment at the land plot |
Project capacity |
4 816 sq.m., 4455sq.m. from them is residential area (80 apartments), 361sq.m. is commercial area. |
Financial estimation of the project |
Total cost of the project, mln rubles |
4,7 |
Investment capacity, mln rubles |
4,7 |
Conditions of investor participation |
Direct investments |
Payback period |
2,6 |
Land characteristics |
Location |
17/5 Shkolnaya street, Krasnodar City |
Land plot area (m2) |
5622 |
Ground categories |
Land of settlement |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
100 kw |
80 |
Gas supply |
222,8 |
100 |
Water supply |
77 m3/24 hours |
100 |
Sewerage system |
77 m3/24 hours |
100 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
|
5 |
Center of federal subject |
Krasnodar city |
– |
Highway (regional, federal significance) |
M-4 «DON» |
5 |
Roads of local significance |
Shkolnaya street |
0,08 |
Nearest railway station |
Krasnodar-Sortirovochny |
5 |
Nearest railway lines |
Krasnodar-Tixoretsk |
0,8 |
Airport |
Krasnodar |
10 |
Seaport |
Novorossiisk |
150 |