Project name |
Building of manystoried settlements at the land plot, the area of which is 23398 sq.m. 9, Znamensky street. |
Location of the project |
Krasnodar city |
Industry classification |
House building |
Basic information about the project |
Project essence |
Building of residential and commercial real estate at the land plot |
Project capacity |
20 681 sq.m., 17 675 sq.m. from them is residen-tial area (320 apartments), 3 006 sq.m. is com-mercial area |
Financial estimation of the project |
Total cost of the project, mln rubles |
19,9 |
Investment capacity, mln rubles |
19,9 |
Conditions of investor participation |
Direct investments |
Payback period |
3,5 |
Land characteristics |
Location |
9, Znamensky street, Krasnodar City |
Land plot area (m2) |
23 398 |
Ground categories |
Land of settlement |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
390 kw. |
Connection to be made to the electricity network of power of the 6 micro-district”Pochtovy”. |
Gas supply |
906 m3/ hour |
Connection of gas distribution network of the 6 micro-district”Pochtovy”. |
Water supply |
300 m3/24 hours |
Connection to be made to the water supply network of the 6 micro-district”Pochtovy”. |
Sewerage system |
300 m3/24 hours |
Provided by the connection to the sewage network of the 6 micro-district”Pochtovy”. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
|
10 |
Center of federal subject |
Krasnodar city |
– |
Highway (regional, federal significance) |
M-4 «DON» |
2 |
Roads of local significance |
Gidrostroitelei street |
0,5 |
Nearest railway station |
Krasnodar-Sortirovochnaya |
7 |
Nearest railway lines |
Krasnodar-Kropotkin |
7 |
Airport |
Krasnodar |
3 |
Seaport |
Novorossiisk |
150 |