Project name |
Residential development of a plot of land with an area of 34.26 ha |
Location of the project |
Krasnodar city |
Industry classification |
House building |
Basic information about the project |
Project essence |
Construction of residential and commercial real estate on a plot of land |
Project capacity |
140 000 sq.m. including 126 000 sq.m. of residen-tial area (2 520 apartments) and 14 000 sq.m. of commercial area |
Financial estimation of the project |
Total cost of the project, mln rubles |
154,7 |
Investment capacity, mln rubles |
154,7 |
Conditions of investor participation |
Direct investments |
Payback period |
4,5 |
Land characteristics |
Location |
Location: western part of Krasnodar City, to the northwest of Krasnykh-Partizan and Azovskaya streets. |
Land plot area (m2) |
342 595 |
Ground categories |
Land of settlement |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
3,200 kw |
Connection to be made to the power dis-tribution network of the Substation “Voengorodok” (6 600 ì) |
Gas supply |
5,833 cmb/h |
Connection to be made to the planned and the already constructed gas distribution networks upon commissioning of 4A Gas Distribution Substation(14 000 ì) |
Water supply |
2,730 cmb/24 h |
Connection to be made to the planned and the already constructed water distribution networks upon commissioning of a pros-pective water intake facility. Participation in construction of water dis-tribution networks required (4000ì) |
Sewerage system |
2,730 cmb/24 h |
Connection to be made to the planned and the already existent sewage networks upon commissioning of a prospective sewage collector No. 20. Participation in expanding the municipal water treatment plant No.2 required (1000ì) |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
|
10 |
Center of federal subject |
Krasnodar City |
– |
Highway (regional, federal significance) |
Krasnodar-Temruk |
3 |
Roads of local significance |
Krasnykh-Partizan street |
Main roads connecting the neighborhood to the down-town: Krasnykh-Partizan street, Blizhny-Zapadny-Obkhod road with further exit to Kalinina street |
Nearest railway station |
Krasnodar 2 |
10 |
Nearest railway lines |
Krugovaya street |
1,5 |
Airport |
Krasnodar |
20 |
Seaport |
Novorossiisk |
150 |