Project name |
Ñomprehensive development of a land plot for residential construction |
Location of the project |
Krasnodar city |
Industry classification |
House building |
Basic information about the project |
Project essence |
Development of residential and commercial real estate on a land plot with the total area of 7,69 ha |
Project capacity |
60 480 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
56,4 (*euro exchange rate:1 euro equals 38 roubles) |
Investment capacity, mln rubles |
56,4 (*euro exchange rate:1 euro equals 38 roubles) |
Conditions of investor participation |
Direct investments |
Payback period |
3,4 |
Land characteristics |
Location |
Eastern part of Krasnodar city, to the north of Tikhoretskaya street and to the west of Vostochno-Kruglikovskaya street. |
Land plot area (m2) |
76 936 |
Ground categories |
Land of settlement |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
1350 kw |
connection to be made to the electricity network of the electric power substation Voengorodok. (7 000) |
Gas supply |
- |
connection to be made to the planned and erected gas-distribution network after putting into operation gas substation 4A. (10 500) |
Water supply |
1554,40 m3/24 hours |
connection to be made to the planned and erected water supply network after putting into operation of a perspective water sta-tion Severny. Participation in a shared construction of a water network is required (3000) |
Sewerage system |
1554,40 m3/24 hours |
connection to be made to the planned and erected sewage after putting into operation a perspective manifold No 20 (2nd line). Shared participation in expanding munic-ipal sewage disposal plants No 2 is re-quired (3000) |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
|
5 km. From the city centre. The main roads connecting the district with the centre are Tikhoretskayay and Severnaya streets. |
Center of federal subject |
Krasnodar City |
– |
Highway (regional, federal significance) |
M 4 «DON» |
3 |
Roads of local significance |
Vostochno-Kruglikovskaya street |
0,2 |
Nearest railway station |
Krasnodar-Sortirovochnaya |
2 |
Nearest railway lines |
Krasnodar-Tixoretsk |
5 |
Airport |
Krasnodar |
10-12 |
Seaport |
Novorossiisk |
150 |