Placement the low rise cottage small town for 30 houses

Project name Placement the low rise cottage small town for 30 houses
Location of the project Otradnenskiy district
Industry classification House building
Basic information about the project
Project essence Construction of 30 cottages by a total area 3000 sq.m. (fast erected house construction)
Project capacity Total area 3000 sq.m. (30 cottages on 100 m2)
Financial estimation of the project
Total cost of the project, mln rubles 50,725 mln. rub.
Investment capacity, mln rubles 50,725 mln. rub.
Conditions of investor participation Direct investment (100%)
Payback period 2,4 years
Land characteristics
Location Village Otradnaya, street 2-nd and 3-d Sadoviy lane (south side of the village)
Land plot area (m2) 30 000 sq. m.
Ground categories Settlement lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply ÊÒP-160ÊÂÀ, line 0,4êÂ, line 10ê 600, 100
Gas supply D=89 mm 0 (from existing gas line)
Water supply Vtank=4,0 m3 0 (In connection with absence of a water planting network and the necessary debit of water on a wa-ter-fence of village Otradnaya it is necessary to provide an independent source of wa-ter supply)
Sewerage system Vseptic = 10,8 m3 Dpipe=100-150mm 5-6 meters (from building)
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center village Otradnaya 0
Center of federal subject city Krasnodar 300
Highway (regional, federal significance) Rostov-on-Don – Makhachkala 80
Roads of local significance village Udobnaya – village Otradnaya(street Yuzhnaya) – town Armavir 1,1
Nearest railway station town Armavir 80
Nearest railway lines town Armavir 80
Airport town Armavir 80
Seaport town Novorossiysk 440