Low-rise buildings complex

Project name Low-rise buildings complex
Location of the project Tbilisskiy district
Industry classification House building
Basic information about the project
Project essence Construction of low-rise buildings in settlement Oktyabrsky of Tbilissky district
Project capacity 250 low-rise buildings of 120 sq.m.
Financial estimation of the project
Total cost of the project, mln rubles 561 mln.rbl.
Investment capacity, mln rubles 561 mln.rbl.
Conditions of investor participation Direct investments
Payback period 2,8 years
Land characteristics
Location Behind new buildings construction site of settlement Oktyabrsky to the south direction
Land plot area (m2) 200 000 sq.m.
Ground categories settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 110/35/10 kw 500
Gas supply from existing gas pipe with high pressure 760
Water supply from existing water pipe d-110mm., free pressure in net – 1,5 atm. 800
Sewerage system local
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village 7,7
Center of federal subject Krasnodar city 107
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 6,7
Roads of local significance existing motoroad with gravel surfacing 0,9
Nearest railway station Grechishkino station 10
Nearest railway lines Krasnodar-Kropotkin 9,6
Airport Krasnodar airport 9,7
Seaport Novorossiysk seaport 287