Project name |
Low-rise buildings complex |
Location of the project |
Tbilisskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Construction of low-rise buildings in settlement Oktyabrsky of Tbilissky district |
Project capacity |
250 low-rise buildings of 120 sq.m. |
Financial estimation of the project |
Total cost of the project, mln rubles |
561 mln.rbl. |
Investment capacity, mln rubles |
561 mln.rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
2,8 years |
Land characteristics |
Location |
Behind new buildings construction site of settlement Oktyabrsky to the south direction |
Land plot area (m2) |
200 000 sq.m. |
Ground categories |
settlements land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from existing power station 110/35/10 kw |
500 |
Gas supply |
from existing gas pipe with high pressure |
760 |
Water supply |
from existing water pipe d-110mm., free pressure in net – 1,5 atm. |
800 |
Sewerage system |
local |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Tbilisskaya village |
7,7 |
Center of federal subject |
Krasnodar city |
107 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
6,7 |
Roads of local significance |
existing motoroad with gravel surfacing |
0,9 |
Nearest railway station |
Grechishkino station |
10 |
Nearest railway lines |
Krasnodar-Kropotkin |
9,6 |
Airport |
Krasnodar airport |
9,7 |
Seaport |
Novorossiysk seaport |
287 |