Project name |
Embankment complex building in settlement Kuchugury |
Location of the project |
Temrukskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Construction of Embankment complex building in settlement Kuchugury with comfortable cafe, beach, social and entertainment complex, summer stage, with trade and catering organization on waterfront and beach locations |
Project capacity |
5800 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
28,2 |
Investment capacity, mln rubles |
28,2 |
Conditions of investor participation |
Direct investments |
Payback period |
1,75 |
Land characteristics |
Location |
Krasnodar region, Temryuk district, set. Kuchugury |
Land plot area (m2) |
6100 m2 |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Substation 35/10 \"Zaporozhskaya\" VL - 10-ZP-9 kW L = 0,3 km Three transformer substations each 250 kVA |
270 |
Gas supply |
High pressure pipeline D=100 mm Rabochaya str |
850 |
Water supply |
Asbestos cement line D=150 mm Primorskaya str. |
200 |
Sewerage system |
To project wastewater treatment facilities and stormwater network |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Temryuk town |
45 |
Center of federal subject |
Krasnodar city |
185 |
Highway (regional, federal significance) |
Motorway “Novorossiysk – Kerch Channel” |
3 |
Roads of local significance |
Motorway “Fontalovskaya- Kuchugury” |
0.2 |
Nearest railway station |
Railway station “Fontalovskaya“ |
3 |
Nearest railway lines |
Railway “Novorossiysk – port Kavkaz” |
3 |
Airport |
Anapa town |
105 |
Seaport |
1) Port Temryuk; 2) Port Kavkaz; 3) Port Taman |
1) 47; 2) 15; 3) 57 |