Project name |
Residential complex “Vostochnyi” in Temryuk |
Location of the project |
Temrukskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
The structure of a residential district includes retail space, multi-sports complex with football field and grandstand, a complex of residential houses - secondary school, nursery, boiler room |
Project capacity |
42 000 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
960.4542 million rubles |
Investment capacity, mln rubles |
960.4542 million rubles |
Conditions of investor participation |
Direct investments |
Payback period |
4,61 years |
Land characteristics |
Location |
Krasnodar region, Temryuk District, st.Golubitskaya |
Land plot area (m2) |
93 700 m2 |
Ground categories |
settlement land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
-To provide the unit 10 kV at the existing SS “Temryuk” - construction of 10 kV line |
1800 |
Gas supply |
From Control Temryuk D=300 mm |
300 |
Water supply |
To perform construction works of II stage intake; - to lay water pipes D=200mm L=1500m from Karjernyi Lane to “Vostochnyi” |
1500 |
Sewerage system |
Pumping station on Buvin street with doubled line D=200 mm |
Connection point – existing Pumping station on Buvin street |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Temryuk town |
- |
Center of federal subject |
Krasnodar city |
160 |
Highway (regional, federal significance) |
Motorway “Novorossiysk- Kerch Channel” |
15 |
Roads of local significance |
Motorway Yuzhnyi bypass of Temryuk |
1 |
Nearest railway station |
Railway station Temryuk |
10 |
Nearest railway lines |
Temryuk railway |
10 |
Airport |
Anapa town |
40 |
Seaport |
1) Port Temryuk; 2) Port Kavkaz |
1) 7; 2) 75 |